USS Vinton (AKA-83): Difference between revisions

From Citizendium
Jump to navigation Jump to search
imported>Caesar Schinas
m (Bot: Delinking dates)
mNo edit summary
 
(3 intermediate revisions by 2 users not shown)
Line 51: Line 51:
|-
|-
|Armament:
|Armament:
| 1 × [[5" /38 caliber gun|5"/38 caliber DP gun]], <br/> 4 × [[40mm/56 caliber gun|twin 40&nbsp;mm AA guns]], <br/>16 × [[20mm antiaircraft gun|20&nbsp;mm AA guns]]
| 1 × [[5" /38 caliber gun|5"/38 caliber DP gun]], <br/> 4 × [[40mm/56 caliber gun|twin 40&nbsp;mm AA guns]], <br/>16 × [[20mm Oerlikon (autocannon)|20&nbsp;mm AA guns]]
|-
|-
|Boats:
|Boats:
Line 63: Line 63:
''Vinton'' was laid down under a [[Maritime Commission]] contract (MC hull 1393) on 20 June 1944 at [[Wilmington, North Carolina]], by the [[North Carolina Shipbuilding Company]]; launched on 25 August 1944; sponsored by Mrs. J. W. Kirkpatrick; acquired by the Navy under a loan-charter basis on 7 September 1944; converted to an [[attack cargo ship]] configuration at [[Baltimore]], Md., by the Bethlehem Steel Company's Key Highway plant; and [[Ship commissioning|commissioned]] on 23 February 1945, Commander John D. Hoffman, USNR, in command.
''Vinton'' was laid down under a [[Maritime Commission]] contract (MC hull 1393) on 20 June 1944 at [[Wilmington, North Carolina]], by the [[North Carolina Shipbuilding Company]]; launched on 25 August 1944; sponsored by Mrs. J. W. Kirkpatrick; acquired by the Navy under a loan-charter basis on 7 September 1944; converted to an [[attack cargo ship]] configuration at [[Baltimore]], Md., by the Bethlehem Steel Company's Key Highway plant; and [[Ship commissioning|commissioned]] on 23 February 1945, Commander John D. Hoffman, USNR, in command.
   
   
Following shakedown training in [[Chesapeake Bay]], ''Vinton'' sailed via the [[Panama Canal]] zone for the Central Pacific and arrived at [[Pearl Harbor]] on 16 April. She conducted training exercises in the Hawaiian operating area for a month and one-half before she weighed anchor on 30 May and got underway for the [[Marianas]]. Two days out, the attack cargo ship was called upon to perform an errand of mercy when an ailing seaman from [[USS Silversides (SS-236)]] was transferred via [[USS Gato (SS-212)]] to ''Vinton'' for an emergency appendectomy. By the time the attack cargo ship arrived at [[Guam]] on [[13 June]], the submariner had recovered sufficiently to rejoin his ship.
Following shakedown training in [[Chesapeake Bay]], ''Vinton'' sailed via the [[Panama Canal]] zone for the Central Pacific and arrived at [[Pearl Harbor]] on 16 April. She conducted training exercises in the Hawaiian operating area for a month and one-half before she weighed anchor on 30 May and got underway for the [[Northern Mariana Islands]]. Two days out, the attack cargo ship was called upon to perform an errand of mercy when an ailing seaman from [[USS Silversides (SS-236)]] was transferred via [[USS Gato (SS-212)]] to ''Vinton'' for an emergency appendectomy. By the time the attack cargo ship arrived at [[Guam]] on [[13 June]], the submariner had recovered sufficiently to rejoin his ship.
   
   
''Vinton'' remained at [[Guam]] until [[25 June]], when she headed for the [[Western Carolines]]. She arrived at [[Ulithi]] the next day, pushed on for the [[Ryukyus]] on [[9 July]], dropped anchor off [[Okinawa]] on the 13th and began unloading her cargo. Despite frequent [[kamikaze]] alerts and a [[typhoon]] evasion maneuver, her crew bent to the task of making inroads into the mountains of cargo in her holds. Returning to [[Ulithi]] on the 28th, ''Vinton'' departed the Western Carolines on the 30th and arrived at [[Pearl Harbor]] on [[6 August]]. Slightly over a week later, the war was over. [[Japan]]—under the staggering weight of two atomic bombs and American armadas which ranged off her shores virtually unchallenged and unchecked—surrendered unconditionally by the 15th of August.
''Vinton'' remained at [[Guam]] until [[25 June]], when she headed for the [[Western Carolines]]. She arrived at [[Ulithi]] the next day, pushed on for the [[Ryukyus]] on [[9 July]], dropped anchor off [[Okinawa]] on the 13th and began unloading her cargo. Despite frequent [[kamikaze]] alerts and a [[typhoon]] evasion maneuver, her crew bent to the task of making inroads into the mountains of cargo in her holds. Returning to [[Ulithi]] on the 28th, ''Vinton'' departed the Western Carolines on the 30th and arrived at [[Pearl Harbor]] on [[6 August]]. Slightly over a week later, the war was over. [[Japan]]—under the staggering weight of two atomic bombs and American armadas which ranged off her shores virtually unchallenged and unchecked—surrendered unconditionally by the 15th of August.
   
   
On [[22 September]], ''Vinton'' commenced her post-war operations supporting the fleet and its bases with cargo lifts to [[Tinian]]; [[Guam]]; [[Subic Bay]], Philippine Islands; [[Manus Island|Manus]], in the Admiralties; Batavia, [[Java (island)|Java]]; and Biak, [[New Guinea]], before she returned to Manus en route home. Departing the [[Admiralty Islands]] on 17 January 1946, the attack cargo ship arrived at [[San Francisco]] on [[5 February]].
On [[22 September]], ''Vinton'' commenced her post-war operations supporting the fleet and its bases with cargo lifts to [[Tinian]]; [[Guam]]; [[Subic Bay]], Philippine Islands; [[Manus Island|Manus]], in the Admiralties; Batavia, [[Java (island)|Java]]; and Biak, [[New Guinea]], before she returned to Manus en route home. Departing the [[Admiralty Islands]] on 17 January 1946, the attack cargo ship arrived at [[San Francisco, California]] on [[5 February]].
   
   
Departing [[San Francisco]] Bay on [[24 February]], bound for the east coast, ''Vinton'' steamed via the [[Panama Canal]] and arrived at New York on [[15 March]].  
Departing [[San Francisco, California]] Bay on [[24 February]], bound for the east coast, ''Vinton'' steamed via the [[Panama Canal]] and arrived at New York on [[15 March]].  


She was decommissioned on [[16 March]] for return to the [[War Shipping Administration]] the following day.  
She was decommissioned on [[16 March]] for return to the [[War Shipping Administration]] the following day.  
Line 82: Line 82:
*[http://www.navsource.org/archives/10/02/02083.htm NavSource Online: AKA-83 ''Vinton'']
*[http://www.navsource.org/archives/10/02/02083.htm NavSource Online: AKA-83 ''Vinton'']
*[http://ussrankin.org/id352.htm 51 Years of AKAs]
*[http://ussrankin.org/id352.htm 51 Years of AKAs]
[[Category:Suggestion Bot Tag]]

Latest revision as of 11:00, 2 November 2024

This article is developed but not approved.
Main Article
Discussion
Related Articles  [?]
Bibliography  [?]
External Links  [?]
Citable Version  [?]
 
This editable, developed Main Article is subject to a disclaimer.
TollandClassAKA.jpg Tolland class AKA, similar to USS Vinton
History
Laid down: 20 June 1944
Launched: 25 August 1944
Commissioned: 23 February 1945
Decommissioned: 16 March 1946
Struck: 5 June 1946
Fate: Merchant service to 1972
General Characteristics
Hull Type: C2-S-AJ3
Displacement: 8,635 tons light, 13,910 tons loaded
Length: 459 ft 2 in (140 m)
Beam: 63 ft (19.2 m)
Draft: 26 ft 4 in (8.0 m)
Propulsion: GE geared steam turbine drive, single propeller,
6,000 shp (4.5 MW)
Speed: 16.5 knots (30.6 km/h)
Complement: 395 (62 officers, 333 men), plus embarked troops
Armament: 1 × 5"/38 caliber DP gun,
4 × twin 40 mm AA guns,
16 × 20 mm AA guns
Boats: 14 LCVP,
8 LCM
NOTES: Some sources report different displacements for ships of this type. Speed and complement may have changed as the ship or her mission were modified. Often one or two LCVPs were replaced by LCPLs. 20mm AA guns were sometimes removed.

USS Vinton was a Tolland class attack cargo ship named after Vinton County, Ohio. She was designed to carry military cargo and landing craft, and to use the latter to land weapons, supplies, and U.S. Marines on enemy shores during amphibious operations. She served as a commissioned ship for 12 months.

History

Vinton was laid down under a Maritime Commission contract (MC hull 1393) on 20 June 1944 at Wilmington, North Carolina, by the North Carolina Shipbuilding Company; launched on 25 August 1944; sponsored by Mrs. J. W. Kirkpatrick; acquired by the Navy under a loan-charter basis on 7 September 1944; converted to an attack cargo ship configuration at Baltimore, Md., by the Bethlehem Steel Company's Key Highway plant; and commissioned on 23 February 1945, Commander John D. Hoffman, USNR, in command.

Following shakedown training in Chesapeake Bay, Vinton sailed via the Panama Canal zone for the Central Pacific and arrived at Pearl Harbor on 16 April. She conducted training exercises in the Hawaiian operating area for a month and one-half before she weighed anchor on 30 May and got underway for the Northern Mariana Islands. Two days out, the attack cargo ship was called upon to perform an errand of mercy when an ailing seaman from USS Silversides (SS-236) was transferred via USS Gato (SS-212) to Vinton for an emergency appendectomy. By the time the attack cargo ship arrived at Guam on 13 June, the submariner had recovered sufficiently to rejoin his ship.

Vinton remained at Guam until 25 June, when she headed for the Western Carolines. She arrived at Ulithi the next day, pushed on for the Ryukyus on 9 July, dropped anchor off Okinawa on the 13th and began unloading her cargo. Despite frequent kamikaze alerts and a typhoon evasion maneuver, her crew bent to the task of making inroads into the mountains of cargo in her holds. Returning to Ulithi on the 28th, Vinton departed the Western Carolines on the 30th and arrived at Pearl Harbor on 6 August. Slightly over a week later, the war was over. Japan—under the staggering weight of two atomic bombs and American armadas which ranged off her shores virtually unchallenged and unchecked—surrendered unconditionally by the 15th of August.

On 22 September, Vinton commenced her post-war operations supporting the fleet and its bases with cargo lifts to Tinian; Guam; Subic Bay, Philippine Islands; Manus, in the Admiralties; Batavia, Java; and Biak, New Guinea, before she returned to Manus en route home. Departing the Admiralty Islands on 17 January 1946, the attack cargo ship arrived at San Francisco, California on 5 February.

Departing San Francisco, California Bay on 24 February, bound for the east coast, Vinton steamed via the Panama Canal and arrived at New York on 15 March.

She was decommissioned on 16 March for return to the War Shipping Administration the following day.

Struck from the Navy list on 5 June, she soon entered mercantile service as SS Gulf Shipper with the Gulf and South American Steamship Co. On 23 September 1964, the American President Lines, Inc., purchased the erstwhile attack cargo ship and renamed her President Harding. Subsequently, her ownership again changed hands on 29 September 1966, when she was purchased by the Pacific Far East Lines and renamed America Bear. In late 1969, the Columbia Steamship Company purchased the vessel for use in the Pacific freight trade and renamed her Columbia Beaver—in which livery she served until late 1972, and after which time her documentary trail runs cold.

References

External links