USS Polana (AKA-35): Difference between revisions
imported>Subpagination Bot m (Add {{subpages}} and remove any categories (details)) |
imported>Caesar Schinas m (Bot: Delinking dates) |
||
Line 62: | Line 62: | ||
==History== | ==History== | ||
''Polana'' (AKA-35), an attack cargo ship, was laid down | ''Polana'' (AKA-35), an attack cargo ship, was laid down 11 December 1944 as MC hull 1896 by [[Walsh-Kaiser Co., Inc.]], [[Providence, R.I.]]; launched 17 January 1945; sponsored by Mrs. Felix Gygax; completed and accepted at the [[Boston Navy Yard]]; and [[Ship commissioning|commissioned]] 21 February 1945, LCDR K. D. Gallinger in command. | ||
After shakedown along the [[East Coast of the United States|Atlantic coast]] and in [[Chesapeake Bay|Chesapeake]] waters, ''Polana'' steamed for [[Newport, R.I.]] to assume duties as an Amphibious Force training ship. Operating between Newport and [[Naval Station Norfolk|Norfolk]], she trained several pre-commissioning details through the first week of May. | After shakedown along the [[East Coast of the United States|Atlantic coast]] and in [[Chesapeake Bay|Chesapeake]] waters, ''Polana'' steamed for [[Newport, R.I.]] to assume duties as an Amphibious Force training ship. Operating between Newport and [[Naval Station Norfolk|Norfolk]], she trained several pre-commissioning details through the first week of May. | ||
Line 70: | Line 70: | ||
From this point ''Polana’s'' assignments entailed a series of inter-island cargo runs that included extensive steaming and long hours of cargo handling. [[Guam]] served as a base of operations from the end of June as she delivered cargo at [[Tinian]] [[30 June]] and at [[Saipan]] [[6 July]]–[[9 July]]. Through the summer she also called at [[New Caledonia]], [[Espiritu Santo]], and at various [[Philippine]] ports. She stood out of [[San Pedro Bay (Philippines)|San Pedro Bay]] in convoy [[1 September]] for [[Yokohama]], Japan, arriving [[8 September]] to offload occupation troops and supplies. | From this point ''Polana’s'' assignments entailed a series of inter-island cargo runs that included extensive steaming and long hours of cargo handling. [[Guam]] served as a base of operations from the end of June as she delivered cargo at [[Tinian]] [[30 June]] and at [[Saipan]] [[6 July]]–[[9 July]]. Through the summer she also called at [[New Caledonia]], [[Espiritu Santo]], and at various [[Philippine]] ports. She stood out of [[San Pedro Bay (Philippines)|San Pedro Bay]] in convoy [[1 September]] for [[Yokohama]], Japan, arriving [[8 September]] to offload occupation troops and supplies. | ||
The fall found her assigned to "Magic Carpet" duty, and through the winter she continued cargo runs between the Philippines, [[Japan]], [[Okinawa Island|Okinawa]], and [[Qingdao|Tsingtao, China]]. She departed Guam [[7 December]] and reached [[San Francisco]] [[21 December]]. After the New Year she sailed to the East Coast, arriving Norfolk | The fall found her assigned to "Magic Carpet" duty, and through the winter she continued cargo runs between the Philippines, [[Japan]], [[Okinawa Island|Okinawa]], and [[Qingdao|Tsingtao, China]]. She departed Guam [[7 December]] and reached [[San Francisco]] [[21 December]]. After the New Year she sailed to the East Coast, arriving Norfolk 7 February 1946. She decommissioned [[21 March]] at [[Portsmouth, Virginia|Portsmouth, Va.]], was struck from the Navy List [[1 May]] and delivered to the Maritime Commission 26 June 1946 at [[Lee Hall, Virginia|Lee Hall, Va.]] | ||
==References== | ==References== |
Revision as of 11:54, 8 June 2009
USS Polana (AKA-35) | |
History | |
---|---|
Laid down: | 11 December 1944 |
Launched: | 17 January 1945 |
Commissioned: | 21 February 1945 |
Decommissioned: | 21 March 1946 |
Struck: | 26 June 1946 |
Fate: | Unknown |
General Characteristics | |
Builder: | Walsh-Kaiser Co., Inc. |
Hull type: | S4-SE2-BE1 |
Displacement: | 4,087 tons light, 7,080 tons loaded |
Length: | 426 ft (129.8 m) |
Beam: | 58 ft (17.7 m) |
Draft: | 16 ft (4.9 m) |
Propulsion: | Steam turbo-electric drive; two boilers, two propellers, 6,000 shp (4.5 MW) |
Speed: | 16.9 knots (31.3 km/h) |
Complement: | 321 (20 officers, 301 men), plus 255 embarked troops |
Armament: | 1 × 5"/38 caliber DP gun, 4 × twin 40 mm AA guns, 16 × 20 mm AA guns |
Boats: | 14 LCVP, 8 LCM |
USS Polana (AKA-35) was an Artemis class attack cargo ship named after the minor planet 142 Polana, which in turn was named after the city of Pola (now Pula, Croatia), from which it was discovered. She served as a commissioned ship for 13 months.
History
Polana (AKA-35), an attack cargo ship, was laid down 11 December 1944 as MC hull 1896 by Walsh-Kaiser Co., Inc., Providence, R.I.; launched 17 January 1945; sponsored by Mrs. Felix Gygax; completed and accepted at the Boston Navy Yard; and commissioned 21 February 1945, LCDR K. D. Gallinger in command.
After shakedown along the Atlantic coast and in Chesapeake waters, Polana steamed for Newport, R.I. to assume duties as an Amphibious Force training ship. Operating between Newport and Norfolk, she trained several pre-commissioning details through the first week of May.
Standing out of Hampton Roads, Va. 10 May, Polana transisted the Panama Canal and continued on to Pearl Harbor, arriving 31 May. Assigned to Commander, Amphibious Force, Pacific Fleet, she commenced a series of cargo runs that took her from Pearl Harbor 16 June enroute Eniwetok, where she moored 24 June–25 June.
From this point Polana’s assignments entailed a series of inter-island cargo runs that included extensive steaming and long hours of cargo handling. Guam served as a base of operations from the end of June as she delivered cargo at Tinian 30 June and at Saipan 6 July–9 July. Through the summer she also called at New Caledonia, Espiritu Santo, and at various Philippine ports. She stood out of San Pedro Bay in convoy 1 September for Yokohama, Japan, arriving 8 September to offload occupation troops and supplies.
The fall found her assigned to "Magic Carpet" duty, and through the winter she continued cargo runs between the Philippines, Japan, Okinawa, and Tsingtao, China. She departed Guam 7 December and reached San Francisco 21 December. After the New Year she sailed to the East Coast, arriving Norfolk 7 February 1946. She decommissioned 21 March at Portsmouth, Va., was struck from the Navy List 1 May and delivered to the Maritime Commission 26 June 1946 at Lee Hall, Va.
References
- Dictionary of American Naval Fighting Ships (Primary source for this article)